代做ENEM012 Assignment -1 Advancement of solar energy代做回归

2025-02-28 代做ENEM012 Assignment -1 Advancement of solar energy代做回归

ENEM012 Assignment -1

Advancement of solar energy

AHEP4 learning outcomes assessed:

M4 & M4-FL: Select and critically evaluate technical literature and other sources of information to solve complex problems

Submission format: Electronic, via ELE

Feedback will be written feedback for each individual submission, within three weeks ofsubmission. This assignment is worth 40% of the overall module mark.

Recommendation is not to use any AI tool, in case if you use then follow the guideline page

Template for student declarationsin AI-supported and AI-integrated assessments

From September 2024, all assessments that come under the category of AI-supported and AI-integrated will be required to include a student declaration acknowledging their use of GenAI in their assessment. This will be included as an additional page at the front of the assessment, following this template (which should be included in the assessment brief):

When submitting your assessment, you must include the following declaration, ticking all that apply:

AI-supported/AI-integrated use is permitted in this assessment. I acknowledge the following uses of GenAI tools in this assessment:

I have used GenAI tools for developing ideas.

I have used GenAI tools to assist with research or gathering information.

I have used GenAI tools to help me understand key theories and concepts.

I have used GenAI tools to identify trends and themes as part of my data analysis.

I have used GenAI tools to suggest a plan or structure for my assessment.

I have used GenAI tools to give me feedback on a draft.

I have used GenAI tool to generate image, figures or diagrams.

I have used GenAI tools to proofread and correct grammar or spelling errors.

I have used GenAI tools to generate citations or references.

Other [please specify]

I have not used any GenAI tools in preparing this assessment.

I declare that I have referenced use of GenAI outputs within my assessment inline with the University referencing guidelines.

Please note that submitting your work without an accompanying declaration, or one with no ticked boxes, will be considered a declaration that you have not used GenAI tools in preparing your work.

If a declaration sheet cannot be uploaded as part of an assignment (i.e. at the start of an essay), students understand that by submitting their assessment that are confirming they have followed the assessment brief and guidelines about GenAI use.

Assignment Guidance

•    Critically review on Solar powered Hydrogen

•    You have freedom to choose any solar elements such as Solar collector, BIPV, BIPVT, EV, Floating PV system, Agri-PV

•    The  report should be minimum of 4000 words equivalent (excluding abstract, author, keywords, figures, tables and references). The word limit can be ±10%.

Assignment details

The main aim of the assignment to produce a journal (review) article. The report should include,

•    Title:

•    Author name and affiliation

•    Abstract

•    Keywords

•    Introduction

•    Methods

•    Results/outcome

•    Perspective

•    Conclusion

•    Acknowledgement

•    Reference

For structure you can follow Renewable Energy and Sustainable Energy Reviews or any Elsevier journal suitable for your topic

Report writing details:

STRUCTURE: The report should be aligned as a journal article format. The given format in the below table could be adopted (check more details in the Introduction Lecture). Do not use double column. Use only single column.

PAGE LIMIT: There is no page limit, however the report should have at least 4000 words with margins of 2.54 cm on the left, right, top, bottom

FONT: font for the main body of the report should be size 11 and Times New Roman. Fonts for headings can be slightly larger (12 and for Title 14)

LINE SPACING: 1.15 line spacing for the main body of the report

TABLES AND FIGURES: you are encouraged to use tables and figures where appropriate. Make sure you label them properly and refer to them in the text.

REFERENCES: You should consider citing mostly academic papers (science direct, google scholar). Make sure you properly reference any material cited (including tables and figures if you didn’t make them yourself) to avoid plagiarism! Use a consistent reference style of your choice. For referencing style follow Solar Energyformat.

SUBMISSION: electronic submission to bothE-BART and turnitin. Deadline for submission is midday (12:00) 7th March 2025

Marking scheme

Marking Criteria

Explanation

Total

Marks

Available

(100)

Title, Affiliation, Key words and Abstract

Clarity of the abstract (250-300) words)

15

Introduction  (Aim  & Objectives)

It should be clear and precise introduction explaining why  this review is   essential and  timely. Mention United  nation goal,   IEA,  national target   for sola, hydrogen and transport sector etc.

15

Methods Section

Currently there is away to write methods for the review article which should be followed (Follow Elsevier journal guidance). You can use VOS tool or clear flow diagram to explain how the literature review was done.

10

Results and

Discussion

This is the main body of the review article where critically previous work will be reviewed to solve the complex problems. Figures should have 300dpi.

If you take figure after caption mention figure is taken, IF you make it then mention author creation.

In a review paper results section can be named with other headings depends on how you want to explain your work.

Figure, Table, Title, Abstract, Reference even in the text are excluded from the word count. Emphasis will be given more on the critical content than the word count.

40

Perspective

This  is a place where you can your own logical perspective of the work you performed in the previous section

10

Conclusion, and

Reference

Concrete conclusion, Use of journal for references (solar energy format), Author and year in the text and in the list it will be alphabetical order.

Minimum  50  reference is essential. For maximum there is no limit.

10